TRANSPORTATION ALTERNATIVES – SUMMARY OF PROJECT FUNDING

Click on thumbnails to view enlarged photos

* TPA Funding obtained from Draft Tentative Work Program or TIP.

**Total Cost obtained from Cost Sheet from original application year.

Project list last updated: 03/18/2024

Application Year-Rank Project Number Project Applicant Project Location Project Description Construction Year TPA Funding* Total Cost** Before After
2023-1 4529981 Boca Raton NW 6th Way from South of NW 38th Drive/Circle to Spanish River Blvd Construct 10′ shared use path and include bicycle and pedestrian intersection upgrades. FY 2027 $888K $1.5M Image of Spanish River Blvd. & NW 6th Way south end looking north  
2023-2 4530021 Palm Beach County Camino Real from Spanish River Rd to South Ocean Blvd Construct 7′ buffered bike lanes on both sides of the road and 5 ft sidewalk on the south side. FY 2027 $1.1M $1.9M    
2023-3 4529991 West Palm Beach Spruce Ave from 36th St to 40th St Construct designated bike lanes, ADA curb ramps and sidewalks, new crosswalks, traffic calming, and pedestrian scale lighting. FY 2027 $1.1M $1.5M  
2023-4 4530011 Palm Beach Gardens Lilac St from North Military Trl to Plant Dr Widen existing sidewalk to 10′ shared use path and construct new 10′ shared use path with a midblock crossing. FY 2027 $1M $1.2M  
2023-5 4530001 Indian Trail Improvement District 140th Ave North from Orange St to 61st St North and 61st St North from 140th Ave North to the M-1 Canal Construct 8′ unpaved path. FY 2027 $947K $1.2M  
2022-1 4507871 Indian Trail Improvement District Hamlin Blvd from Hall Blvd to Grapeview Blvd; Grapeview Blvd from Hamlin Blvd to Citrus Grove Blvd; Citrus Grove Blvd from Hall Blvd to Avocado Blvd Construct 10′ shared use path and expand existing sidewalk to 8′. FY 2026 $991K $1.5M  
2022-2 4508291 City of Palm Beach Gardens Fairchild Ave from Fairchild Gardens Ave to Campus Dr Construct buffered bicycle lanes and 8′ pathway on south side of roadway FY 2026 $1M $1.5M  
2022-3 4508621 City of West Palm Beach 49th St from Greenwood Ave to North Flagler Dr Construct ADA curb ramps and sidewalks, traffic calming speed humps and sharrows FY 2026 $353K $1M  
2022-4 4508241 Village of Royal Palm Beach Various Locations – Local Roads Install pedestrian and bicycle network wayfinding signage FY 2026 $738K $934K  
2022-5 4507841 & 4527842 City of Boca Raton & SFRTA SW 18th St from Military Trail to Addison Ave Construct 10′ shared use paths and missing crosswalks and sidewalks FY 2026 $1.5M $1.5M    
2021-1 4490051 City of Palm Beach Gardens Burns Rd from Military Trail to Alt A1A Construct 9.5′ separated two-way bicycle track Construction Estimated Begin July 2025 $848K $1.3M  
2021-2 4489991 City of Boca Raton El Rio Trail from Glades Rd to Yamato Rd Install lighting FY 2025 $1M $1.3M  
2021-3 4490021 Indian Trails Improvement District Grapeview Blvd from Key Lime Blvd to 60th St; Key Lime Blvd from Hall Blvd to M-1 Canal Construct 10′ shared use path and 8′ pathway FY 2025 $1M $1.7M  
2021-4 4490061 Village of Wellington C-8 Canal from Forest Hill Blvd to Stribling Way Construct 10′ shared use path FY 2025 $552K $738K  
2020-1 4483011 City of Lake Worth Beach Various Locations – Local Roads Construct ADA curb ramps and sidewalk Estimated Construction Start April 2024 $1M $1.02M  
2020-2 4483021 City of Palm Beach Gardens Kyoto Gardens Drive from Military Trail to Alt A1A Construct 5′ bike lane and 8′ pathway on north side of roadway Under Construction –  Completion Estimated April 2024 $1.2M $1.3M  
2020-3 4483031 Westgate CRA / Palm Beach County Cherry Rd from Military Trail to Quail Dr Construct 10-12′ shared use path and pedestrian lighting on north side of the roadway Estimated Construction Start Fall 2024 $1M $1.96M  
2020-4 4483041 Palm Tran Countywide Install 5′ sidewalk connections and ADA bus stop enhancements to 110 bus stops FY 2024 $299K $355K  
2019-1 4460771 Westgate CRA/Palm Beach County Seminole Blvd
from Okeechobee Blvd to Oswego Ave
Construct 12 ft shared use paths, high visibility crosswalks, and pedestrian lighting Under Construction –  Completion Estimated July 2024 $1.5M $1.7M BEFORE: Westgate CRA Seminole Blvd.  
2019-2 4460781 City of Boynton Beach SE 1st St. from Boynton Beach Blvd to Woolbright Rd Construct 10 ft shared use path on western side of roadway Estimated Construction Start July 2024 $1M $3.25M BEFORE: SE 1st St Shared-Use Path  
2019-3 4460801 Town of Loxahatchee Groves Okeechobee Blvd
from A Rd to Folsom Rd
Construct 6 ft paved trail with fence on south side of roadway Project Withdrawn      
2019-4 4460841 City of Palm Beach Gardens Various existing pedestrian crossings along Holly Drive Install pedestrian activated flashers at 12 existing crossings Construction Completed March 2024 $887K $900K  
2018-1 4443501 City of West Palm Beach Clear Lake Trail North (Phase 1) (NW side of Clear Lake from
Okeechobee Blvd to Palm Beach Lakes Blvd)
Construct 10 ft shared Use Path on west side of Clear Lake in West Palm Beach. Construction Completed May 2024 $2M $1.8M BEFORE: Clear Lake Trail  
2018-2 4443591 City of Greenacres Dillman Trail (Forest Hill Blvd to Dillman Rd) Construct 12 ft shared use path Construction Completed in 2023 $723K $772K BEFORE: Dillman Trail Photo of the completed Dillman Trail in Greenacres, a 12 ft. shared use pathway
2018-3 4443671 Palm Beach County (Westgate CRA) Bridgeman Dr, Wellington Rd, Prairie Rd (Phase 2) Install 5 ft sidewalks and pedestrian scale lighting Construction completed December 2022 $995K $1.18M BEFORE: Bridgeman Dr. Photo of the completed sidewalks and pedestrian scale lighting along Bridgeman Dr.
2018-4 4443661 Palm Beach County A1A/Ocean Dr. (Between Donald Ross Rd and Indiantown Rd) Pedestrian Crossing Enhancements Construction Completed 2023 $790K $796K
 2017-1 4415271 City of West Palm Beach  Northmore neighborhood  Construct sidewalks and shared use path Construction Begin January 2025 $590K $2.2M BEFORE: Northmore  
 2017-2 4415301 Palm Beach County (Westgate CRA)  Belvedere Heights neighborhood  Install streetlights and sidewalks Construction completed 2022 $925K $1.1M BEFORE: Belvedere Heights  
 2017-4 4415311  Village of Royal Palm Beach  FPL Pathway (Lamstein Ln to Las Palmas St) Install LED lighting adjacent to FPL pathway Construction Complete $712K $1.16M BEFORE: FPL Pathway BEFORE: FPL Pathway
2016-1 4400141 Village of Wellington Aero Club Dr (Greenbriar Blvd to Binks Forest Dr) Construct 10′ shared use path Construction Completed in 2022 $774K $765K BEFORE: Aero Club Dr.
2016-2 4400151 City of West Palm Beach North Shore Pedestrian Bridge (between 39th St. and 43rd St.) Construct new pedestrian bridge parallel to  existing North Shore Dr. bridge on the west side. Construction Scheduled Summer 2024 $993K $1.29M BEFORE: Northshore Pedestrian Bridge  
2016-3 4400121 City of West Palm Beach Roosevelt Estates neighborhood Install ADA ramp improvements and crosswalks with texturized pavement Under Construction – Completion Estimated December 2024 $565K $1.1M BEFORE: Roosevelt Estates  
2016-4 4400171 City of Delray Beach Various Alleyways Shared Use Paths in Alleyways Construction Completed in 2021 $872K $2.57M
2015-1 4382891 City of Delray Beach Seacrest Blvd (NE 22nd St to Gulfstream Blvd) Add green bike lanes, wider sidewalks, brick crosswalks and school zone lighting Construction Completed in 2021 $749K $1.7M
2015-2 4287181 Village of Tequesta US1 (Beach Rd to Martin County Line) Add buffered bike lanes, street trees and signage Construction Completed in 2018 $709K $3.05M BEFORE: US-1 Multimodal Improvements AFTER: US-1 Multimodal Improvements
2015-3 4383061 Village of Wellington Binks Pointe Pathway (Binks Forest Dr to Flying Cow Rd) Construct shared use pathway to connect Binks Pointe area to Wellington Environmental Preserve Construction Completed in 2019 $391K $549K BEFORE: Binks Pointe Pathway AFTER: Binks Pointe Pathway
2015-4 4382901 Village of Royal Palm Beach Various Royal Palm Beach neighborhoods Upgrade existing sidewalks to ADA standards in residential neighborhoods Construction Completed in 2021 $683K $839K
2015-5 4382911 City of Belle Glade Various locations near Gove and Belle Glade Elementary Schools Construct missing sidewalk links Construction Completed in 2019 $672K $1.2M BEFORE: Belle Glades School Sidewalks After: Belle Glade Sidewalks
2015-6 4383851 City of West Palm Beach Various locations near Palm Beach Neighborhood Schools Upgrade existing sidewalks to ADA standards near schools Construction Completed in 2020 $723K $878K BEFORE: West Palm Beach ADA Sidewalk Improvements AFTER: West Palm Beach ADA Sidewalk Improvements
2014-1 4368721 City of Delray Beach NE 2nd Ave (NE 13th St to NE 22nd St) Construct sidewalks, add designated bike lanes, reduce vehicle travel lane widths, install landscaping Construction Completed in 2019 $745K $1.63M BEFORE: NE 2nd Ave. Multimodal Improvements
2014-2 4369301 Palm Beach County Australian Ave (9th St to 13th St, Kirk Road), (Forest Hill Blvd to Pot O’ Gold St.), and (Military Trail – Dolphin Dr to Old Military Tr) Safe Routes to Schools-Install mast arm school zone flashers Construction Completed in 2021 $407K $482K BEFORE: Palm Beach County Safe Routes to Schools AFTER: Palm Beach County Safe Routes to Schools
2014-4 4369321 City of West Palm Beach North Shore Neighborhood (Residential Streets bounded by 45th St,Congress Ave., Australian Ave and Lake Mangonia) Construct ADA compliant ramps and sidewalks, enhanced crosswalks and signage Construction Completed in 2021 $485K $573K BEFORE: North Shore Pedestrian Improvements BEFORE: North Shore Pedestrian Improvements
2014-5 4368741 Village of Royal Palm Beach Okeechobee Blvd (Folsom Rd to State Rd 7) and Partridge Lane (Okeechobee Blvd to Sparrow Dr) Install pedestrian-scaled lighting, roadway lighting, and 6 ft wide sidewalk on the east side of Partridge Lane Construction Completed in 2019 $368K $1.54M

BEFORE: Okeechobee Blvd. Pedestrian Improvements

BEFORE: Okeechobee Blvd. Pedestrian Improvements

BEFORE: Okeechobee Blvd. Pedestrian Improvements

BEFORE: Okeechobee Blvd. Pedestrian Improvements

2013-1 4350841 City of Lake Worth 5th Ave South (A St to F St) Construct 5-block shared use path in unused ROW Construction Completed in 2017 $753K $1.16M BEFORE: 5th Ave Shared-Use Path AFTER: 5th Ave Shared-Use Path
2013-2 4351461 City of West Palm Beach Tamarind Ave (Banyan Blvd to Palm Beach Lakes Blvd) Add landscaping, lighting, and bike sharrows Project Removed, Funded Locally $782K $958K BEFORE: Tamarind Ave. Multimodal Improvements N/A
2013-4 4350801 City of Delray Beach NE 2nd Ave (George Bush Blvd to NE 13th St) Bike Lane/ Sidewalk Construction Completed in 2018 $733K $1.8M BEFORE: NE 2nd Ave. Multimodal Improvements BEFORE: Delray Beach Seacrest Ave.
2012-1 4331691 Palm Beach County-Office of Community Revitalization Everglades (E Main St to Canal St in Belle Glade) Construct a pedestrian bridge over the L-10 canal Construction Completed in 2016 $636K $760K BEFORE: Belle Glade Pedestrian Bridge AFTER: Belle Glade Pedestrian Bridge
2012-2 4331971 Village of Royal Palm Beach Sparrow Dr (Sweet Bay Ln to Royal Palm Beach Blvd) Construct a  pedestrian bridge over canal Construction Completed in 2016 $621K $734K BEFORE: Sparrow Dr. Ped Bridge AFTER: Sparrow Dr. Pedestrian Bridge
2012-4 4334741 City of West Palm Beach Fern St (Flagler Dr to Tamarind Ave) Improve streetscape, add pedestrian amenities, green bicycle lanes, bicycle racks Construction Completed in 2016 $763K $898K BEFORE: Fern Street AFTER: Fern St. Multimodal Improvements
2012-5  4331961 Village of Wellington Flying Cow Rd. (Binks Pointe to the Wellington Environmental Preserve) Construct 10 ft shared use path Construction Completed in 2017 $750K $883K BEFORE: Flying Cow Rd Shared-Use Path AFTER: Flying Cow Rd Shared-Use Path
2011-1 4316521 City of West Palm Beach 15th St (Australian Ave to N. Dixie Hwy) Add green bicycle lanes, street trees, and enhanced crosswalks Construction Completed in 2015 $754K $809K BEFORE: 15th Street AFTER: 15th St. Multimodal Improvements
2011-2 4316501 City of Delray Beach NE 2nd Ave (NE 4th St to George Bush Blvd) Lighting Construction Completed in 2015 $648K $945K BEFORE: NE 2nd Ave. AFTER: NE 2nd Ave.
2011-3 4238092 Palm Beach County Environmental Resources Management Bluegill Trail (Phase II), Adjacent to Beeline Hwy (PGA Blvd to Northlake Blvd) Construct paved 12 ft shared use path Construction Completed in 2015 $766K $977K BEFORE: Bluegill Trail Shared Use Path AFTER: Bluegill Trail Shared Use Path
2011-4 4316481 City of Boca Raton Patch Reef Trail (Along E-3 Canal from S. Verde Trail to south of Town Center Rd) Construct 8 ft wide pathway (Patch Reef Trail) Construction Completed in 2015 $357K $362K BEFORE: Path Reef Trail Pathway AFTER: Patch Reef Trail Pathway
2011-5 4276551 Village of Royal Palm Beach Crestwood Blvd North (Saratoga Blvd to Royal Palm Beach Blvd) Construct bicycle lanes, landscaping, install a school bus stop Construction Completed in 2013 $805K $891K BEFORE: Crestwood Blvd. Multimodal Improvements AFTER: Crestwood Blvd. Multimodal Improvements
2010-1 4252592 Palm Beach County Environmental Resources Management Jessup Trail (Phase I) (Riverbend Park to the Cypress Creek Natural Area at Martin County line) Construct 10 ft shared use path Construction Completed in 2013 $619K $878K BEFORE: Jessup Trail Shared-Use Path AFTER: Jessup Trail Shared-Use Path
2010-3 4276531 Town of Jupiter A1A (Jupiter Rd to Saturn St) Add bicycle lane, sidewalk, landscaping, signage Construction Completed in 2015 $1M $7.82M BEFORE: A1A Multimodal Improvements AFTER: A1A Multimodal Improvements
2010-4 4296651 City of West Palm Beach Tamarind Ave (Palm Beach Lakes Blvd to 25th St) Landscaping, pedestrian crossing improvements and street furniture Construction Completed in 2017 $750K $964K BEFORE: Tamarind Ave.